No. | Tahun | Proyek | Customer | Lokasi |
---|---|---|---|---|
1 | 2008 | Revitalisasi Feed Mill AWS Plant 1/ Revitalisasi Feed Mill AWS Plant 2 | Central Proteina Prima, PT | Tulang Bawang, Lampung |
2 | 2008 | Addendum/Pekerjaan Tambahan Pemasangan Mesin, Upah Pemindahan Tanki Air 250T uk. 8m x 4,8m | Central Proteina Prima, PT | Tulang Bawang, Lampung |
3 | 2008 | Aquaone Tank SS304, Fish Oil Tank 1400L, Fish Oil Tank 7000L | Central Proteina Prima, PT | Tanjung Morawa, Medan |
4 | 2008 | Agigator For 8000L Fermentation Tank | Central Proteina Prima, PT | Tanjung Morawa, Medan |
5 | 2008 | 1 unit Fish Oil Daily Tank, Tangki SS 304 Ø1200 x 2400 x 450mm | Central Proteina Prima, PT | KIM II Mabar, Medan |
6 | 2008 | MCB Merk ABB | Central Proteina Prima, PT | KIM II Mabar, Medan |
7 | 2008 | Screw Conveyor Dia. 250m x 4mm SS 304 | Central Proteina Prima, PT | KIM II Mabar, Medan |
8 | 2008 | Panel Distribusi | Central Windu Sejati, PT | KIM II Mabar, Medan |
9 | 2008 | Panel Sinkron | Central Windu Sejati, PT | KIM II Mabar, Medan |
10 | 2008 | Box Joint Busduct, Kabel Tray, Jointing | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
11 | 2008 | Penerangan Exc. Feed Mill | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
12 | 2008 | Instalasi Listrik Drier | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
13 | 2008 | Instalasi Listrik Feed Mill | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
14 | 2008 | Penerangan Feed Mill | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
15 | 2008 | Panel MDB 3 | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
16 | 2008 | Panel Capacitor Bank 900 KVAR 400/415V | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
17 | 2008 | Panel MDB 1 | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
18 | 2008 | Panel MDB 2 | Charoen Pokphand Indonesia, PT | KIM II Mabar, Medan |
19 | 2008 | Piping Angin/Minyak, Pemasangan Mesin KCP dan Conveyor & Elevator KCP | Pinago Utama, PT | Palembang |
20 | 2008 | Fabrikasi & Instalasi Tangki Biogas System 8 units | Pinago Utama, PT | Palembang |
21 | 2008 | Fabrikasi & Instalasi Tangki CPO 5000T dan PKO 2000T 2 units | Pinago Utama, PT | Palembang |
22 | 2008 | Pondasi Mesin & Silo KCP 600 M/T & 10 unit Tangki Timbun KCP dan Biogas | Pinago Utama, PT | Palembang |
23 | 2008 | Cake Breaker Conveyor Dia.800x13000mm (CBC Line 1.1) Cake Breaker Conveyor Dia.750x20000mm (CBC Line 1.2) Cake Breaker Conveyor Dia.800x13000mm (CBC Line 2.1) Cake Breaker Conveyor Dia.750x19000mm (CBC Line 2.2) | Berkah Sawit Sumatera, PT | Bagan Batu |
24 | 2008 | Perubahan Threshing Roller ke Shaft Thresshing | Berkah Sawit Sumatera, PT | Bagan Batu |
25 | 2008 | Pembuatan & Pemasangan Storage Tank 500T Dia. 9,554mm=1lot Pembuatan Pondasi Storage Tank 500T Dia. 9,554mm =1lot | Berkah Sawit Sumatera, PT | Negeri Lama |
26 | 2008 | Pembuatan & Pemasangan Liner Digester, Under Threshing Conv, Bucket Fruit Elev | Berkah Sawit Sumatera, PT | Bagan Batu |
27 | 2008 | Accumulator 10 x Dia. 610 x 1200mm | Central Windu Sejati, PT | KIM II Mabar, Medan |
28 | 2008 | Pekerjaan Pemasangan Mesin 1 lo | Central Pertiwi Bahari, PT | Central Pertiwi Bahari, PT |
29 | 2008 | Mechanical & Electrical Pondasi Boiler dan Pondasi Extrution Building | N-Line Agro International Co. Ltd / Lawi-N Power Co. Ltd | Cargill Indonesia, PT Tj. Morawa |