No.TahunProyekCustomerLokasi
12007Storage Water Tank 100m3 Mild Steel Dia. 4,8 x 6m x 6mmCentral Proteina Prima, PTKIM II Mabar, Medan
22007Pengadaan Panel MDB, MCCB & Capasitor BankCentral Proteina Prima, PTKIM II Mabar,
Medan
32007Pengadaan Panel MDB, MCCB & Capasitor BankCentral Proteina Prima, PTSemarang
42007Pekerjaan Pengadaan Steam Headers & Liquid TanksCentral Proteina Prima, PTKIM II Mabar,
Medan
52007
Pengadaan Material Elektrikal Installation Jalur Kabel Bawah Tanah
Central Proteina Prima, PTKIM II Mabar,
Medan
62007Pipa Feed MillCentral Proteina Prima, PTKIM II Mabar, Medan
72007Pengadaan Condensate Tank SectoralCentral Proteina Prima, PTKIM II Mabar, Medan
82007Piping Installation & Material (Pemasangan Pipa Feed Mill)Central Proteina Prima, PTKIM II Mabar, Medan
92007Panel MCC AquaoneCentral Proteina Prima, PTKIM II Mabar, Medan
102007Piping Installation & Material (Compresor Room, Condensate Tank Sectoral, Condensate Tank 7m3, Liquid Piping System & Piping Steam to Feed mill)Central Proteina Prima, PTKIM II Mabar, Medan
112007Pekerjaan Piping Installation &Material (Air Compressor termasuk Pemasangan SMC/Air Regulator)Central Proteina Prima, PTKIM II Mabar, Medan
122007Box Panel PLC & Biaya InstalasiCentral Proteina Prima, PTKIM II Mabar, Medan
132007Pekerjaan Instalasi Steam Piping ke Pellet 4 (Piping Installation & Material)Charoen Pokphand Indonesia, PTKIM II Mabar, Medan
142007Pengadaan Panel MDB, MCCB & Capasitor BankCharoen Pokphand Indonesia, PTKIM II Mabar, Medan
152007 Pengadaan Mechanical Electrical Slaughter House MedanCharoen Pokphand Indonesia, PTKIM II Mabar, Medan
162007Pekerjaan Instalasi Listrik Liquid – EL 43Charoen Pokphand Indonesia, PTKIM II Mabar, Medan
172007Pekerjaan Instalasi Listrik FeedMill – EL 41Charoen Pokphand Indonesia, PTKIM II Mabar, Medan
182007Aquaone Tank SS304, Fish Oil Tank 1400L, Fish Oil Tank 7000LCharoen Pokphand Indonesia, PTTjg. Morawa, Medan
192007Pengadaan Panel SinkronCharoen Pokphand Jaya Farm, PTPekan Baru
202007Water Filtration SystemCharoen Pokphand Jaya Farm, PTKIM II Mabar,
Medan
212008Connecting Ducting to the BoilerHealth Care Glovindo, PTKIM II Mabar,
Medan
222007Piping Steam dari Boiler baru ke RSS dan Caddy – 1 Pinago Utama, PTPalembang