NO | TAHUN | PROYEK | CUSTOMER | LOKASI |
---|---|---|---|---|
1 | 2018 | Pembangunan Palm Kernel Crushing Plant, Kapasitas45-50 MT Tons Per 20 Hours | Sumber Kencana Indo Palma, PT | Desa Ringin, Kec. Batang Gangsal, Kab. Inhil, KM 243,3KM – Prop. Riau |
2 | 2018 | Digester T. 3050 mm x Body 1250 mm c/w As | Jaya Baru Pertama, PT | Pangkalan Susu, Prop. Sumatera Utara |
3 | 2018 | Fabrication and Erection Mini Power Plant Building | Guangdong Yuantian Engineering Company Limited | Dusun huta Ambasang, Rura Tanjung Pakkat, Kab. Humbang Hasundutan – Prop. Sumatera Utara |
4 | 2018 | Pekerjaan Fabrikasi & Erection Scrapper Conveyor (Horizontal FFB Conveyor, Distrbusi FFB Conveyor, Recycle FFB Conveyor, Sterilizer SFB Conveyor, Inclined Sterilizer SFB Conveyor No. 1 dan 2, Pemasangan Conveyor Statis Walk Sterilizer, Pemasangan Pintu Rebusan Dia. 1,2 Mtr, Pemasangan Pipa Steam Inlet dan Perombakannya) | Palma Abadi, PT | Jl. Lintas Timur, KM. 71, Kecamatan Muara Patalik, Desa Dusun Mudo, Jambi |